I am also 90% of the way through building a 3.50mm screwdriver out of aluminum, so far I'm very pleased with how it has turned out. Once I install the blade I will post a picture of the finished piece.
Tuesday, March 12, 2013
Taking Care of Business
I've been manufacturing like a madman so far this week. In just two days I have completed the below tools. They include a full set of hand pushers (delrin tips, aluminum handles), an ETAChron stud adjusting tool (bottom left) an eccentric tool (top left) and a set of KIF shock spring tools (middle, polycarbonate)
I am also 90% of the way through building a 3.50mm screwdriver out of aluminum, so far I'm very pleased with how it has turned out. Once I install the blade I will post a picture of the finished piece.
I am also 90% of the way through building a 3.50mm screwdriver out of aluminum, so far I'm very pleased with how it has turned out. Once I install the blade I will post a picture of the finished piece.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment